\"\"NEW DELHI: The Tower and Infrastructure Providers Association (Taipa<\/a>) believes that the telecom<\/a> infrastructure policy<\/a> formulated by the Narendra Modi-led BJP government in Gujarat was unfair and needs overhaul in tandem with Centre’s Right-of-Way (RoW<\/a>) norms.
\n
Taipa represents mobile tower firms such as Indus
Towers<\/a>, Bharti Infratel, American Tower Corporation (ATC<\/a>), Tower Vision and GTL<\/a> Infrastructure— that deploy infrastructure for— Bharti Airtel<\/a>, Vodafone<\/a> India, Idea Cellular and Reliance Jio<\/a> for telephony services.
\n
“The Gujarat state needs to notify a tower policy, aligned with RoW rules issued by the Central government in order to ensure seamless tower installation across the state irrespective of any particular technology,” Taipa Director General
Tilak Raj Dua<\/a> said.
\n
The state policy notified in October, 2012, according to industry insiders, was biased to favour billionaire Mukesh Ambani-owned pure play fourth-generation (
4G<\/a>) technology operator Reliance Jio Infocomm.
\n
Based on a proposal of Reliance Industries’
Infotel Broadband Service<\/a> Limited (IBSL) which procured Broadband Wireless Access spectrum in 2010, the 21-page guideline talks about deploying telecom network for ‘4G services’ alone.
\n
\nIBSL was later acquired by the Reliance Industries and renamed to Reliance Jio which commercially launched 4G services in September 2016.
\n
\nALSO READ:
After DoT, mobile infrastructure companies turn to PMO for intervention<\/a><\/strong>
\n
\nThe norms, according to the telecom infrastructure lobby group, only regulates provisioning of 4G services by laying fibre and erecting poles rather than focusing on holistic development of telecom infrastructure.
\n
\nThe policy imposes exorbitant charges for laying the OFC cable ranging from Rs 1000- Rs 1500 per meter which contradicts the charges prescribed under the RoW rules notified on November 15, 2016 by the Union government, Taipa added.
\n
Gujarat, the home state of Prime Minister
Narendra Modi<\/a>, however, needs to double the number of mobile towers currently deployed in order to connect the unconnected and ensuring seamless network for government-to-citizen (G2C) services such as Digital India, according to Dua.
\n
\nALSO READ: <\/strong>
ATC open for more mobile tower acquisition opportunity<\/strong><\/a>
\n
\nThe state has close to 26,000 mobile towers mounted with more than 1 lakh base trans-receiver stations serving 69 million wireless subscribers.\n\n<\/body>","next_sibling":[{"msid":62349435,"title":"'Panic button' on mobiles: Trial to begin from Uttar Pradesh on January 26","entity_type":"ARTICLE","link":"\/news\/panic-button-on-mobiles-trial-to-begin-from-uttar-pradesh-on-january-26\/62349435","category_name":null,"category_name_seo":"telecomnews"}],"related_content":[],"msid":62349450,"entity_type":"ARTICLE","title":"Narendra Modi's Gujarat RoW policy 4G biased: Telecom group","synopsis":"Based on a proposal of Reliance Industries\u2019 Infotel Broadband Service Limited (IBSL) which procured Broadband Wireless Access spectrum in 2010, the 21-page guideline talks about deploying telecom network for \u20184G services\u2019 alone.","titleseo":"telecomnews\/gujarats-row-policy-only-favors-4g-technology-taipa","status":"ACTIVE","authors":[{"author_name":"Muntazir Abbas","author_link":"\/author\/479234376\/muntazir-abbas","author_image":"https:\/\/etimg.etb2bimg.com\/authorthumb\/479234376.cms?width=100&height=100&hostid=268","author_additional":{"thumbsize":true,"msid":479234376,"author_name":"Muntazir Abbas","author_seo_name":"muntazir-abbas","designation":"Editor","agency":false}}],"Alttitle":{"minfo":""},"artag":"ETTelecom","artdate":"2018-01-03 12:58:15","lastupd":"2018-01-03 22:04:45","breadcrumbTags":["Narendra Modi","4G","Reliance Jio","TAIPA","Telecom","Infotel Broadband Service","Towers","ATC","Tilak Raj Dua","Row","Bharti Airtel","GTL","Vodafone","policy"],"secinfo":{"seolocation":"telecomnews\/gujarats-row-policy-only-favors-4g-technology-taipa"}}" data-authors="[" muntazir abbas"]" data-category-name="" data-category_id="" data-date="2018-01-03" data-index="article_1">

纳兰德拉·莫迪的古吉拉特行政策4 g的偏见:电信集团

基于提议信实工业的Infotel宽带服务有限公司(IBSL)于2010年获得宽带无线接入频谱,长达21页的拘留指南讨论部署电信网络的4 g服务的孤独。

Muntazir阿巴斯
  • 更新2018年1月3日10:04点坚持
新德里:塔和基础设施提供商协会(氹仔)认为,电信基础设施政策兰德在古吉拉特邦Modi-led人民党政府规定是不公平的,需要改革与中心的通行权()规范。

氹仔代表移动塔印度河等公司,鼓吹美国塔公司(空中交通管制),视觉和塔GTL基础设施——部署基础设施的Bharti Airtel,沃达丰(Vodafone)印度,细胞和想法依赖Jio电话服务。

“古吉拉特邦需要通知塔政策,与行发布的规定由中央政府为了确保无缝塔安装整个州无论任何特定的技术,“氹仔总干事Tilak Raj Dua说。

2012年10月,国家政策的通知,根据业内人士,是偏向支持亿万富翁穆克什Ambani-owned纯玩第四代(4 g)技术运营商依赖Jio Infocomm。

基于一个提议信实工业的Infotel宽带服务有限公司(IBSL)于2010年获得宽带无线接入频谱,长达21页的拘留指南讨论部署电信网络的4 g服务。

IBSL后来被收购的信实工业和重命名为信实Jio商业2016年9月推出4 g服务。

还读:点后,移动基础设施公司转向PMO干预

规范,根据电信基础设施的游说团体,只调节供应铺设纤维和装配波兰人的4 g服务而不是专注于整体电信基础设施的发展。

政策规定的收费过高的OFC电缆从Rs 1000 - 1500卢比每米与行规则下的费用规定通知11月15日,2016年联邦政府,氹仔补充道。

古吉拉特邦,总理的家乡莫迪然而,需要移动的数量增加一倍塔目前部署在以连接无关,确保无缝网络government-to-citizen印度(G2C)服务,如数字,根据Dua。

还读: ATC开放更多的移动塔收购机会

国家有接近26000电话塔安装超过十万的基地trans-receiver站6900万无线用户服务。
  • 发表在2018年1月3日下午12:58坚持
是第一个发表评论。
现在评论

加入2 m +行业专业人士的社区

订阅我们的通讯最新见解与分析。乐动扑克

下载ETTelec乐动娱乐招聘om应用

  • 得到实时更新
  • 保存您最喜爱的文章
扫描下载应用程序
\"\"NEW DELHI: The Tower and Infrastructure Providers Association (Taipa<\/a>) believes that the telecom<\/a> infrastructure policy<\/a> formulated by the Narendra Modi-led BJP government in Gujarat was unfair and needs overhaul in tandem with Centre’s Right-of-Way (RoW<\/a>) norms.
\n
Taipa represents mobile tower firms such as Indus
Towers<\/a>, Bharti Infratel, American Tower Corporation (ATC<\/a>), Tower Vision and GTL<\/a> Infrastructure— that deploy infrastructure for— Bharti Airtel<\/a>, Vodafone<\/a> India, Idea Cellular and Reliance Jio<\/a> for telephony services.
\n
“The Gujarat state needs to notify a tower policy, aligned with RoW rules issued by the Central government in order to ensure seamless tower installation across the state irrespective of any particular technology,” Taipa Director General
Tilak Raj Dua<\/a> said.
\n
The state policy notified in October, 2012, according to industry insiders, was biased to favour billionaire Mukesh Ambani-owned pure play fourth-generation (
4G<\/a>) technology operator Reliance Jio Infocomm.
\n
Based on a proposal of Reliance Industries’
Infotel Broadband Service<\/a> Limited (IBSL) which procured Broadband Wireless Access spectrum in 2010, the 21-page guideline talks about deploying telecom network for ‘4G services’ alone.
\n
\nIBSL was later acquired by the Reliance Industries and renamed to Reliance Jio which commercially launched 4G services in September 2016.
\n
\nALSO READ:
After DoT, mobile infrastructure companies turn to PMO for intervention<\/a><\/strong>
\n
\nThe norms, according to the telecom infrastructure lobby group, only regulates provisioning of 4G services by laying fibre and erecting poles rather than focusing on holistic development of telecom infrastructure.
\n
\nThe policy imposes exorbitant charges for laying the OFC cable ranging from Rs 1000- Rs 1500 per meter which contradicts the charges prescribed under the RoW rules notified on November 15, 2016 by the Union government, Taipa added.
\n
Gujarat, the home state of Prime Minister
Narendra Modi<\/a>, however, needs to double the number of mobile towers currently deployed in order to connect the unconnected and ensuring seamless network for government-to-citizen (G2C) services such as Digital India, according to Dua.
\n
\nALSO READ: <\/strong>
ATC open for more mobile tower acquisition opportunity<\/strong><\/a>
\n
\nThe state has close to 26,000 mobile towers mounted with more than 1 lakh base trans-receiver stations serving 69 million wireless subscribers.\n\n<\/body>","next_sibling":[{"msid":62349435,"title":"'Panic button' on mobiles: Trial to begin from Uttar Pradesh on January 26","entity_type":"ARTICLE","link":"\/news\/panic-button-on-mobiles-trial-to-begin-from-uttar-pradesh-on-january-26\/62349435","category_name":null,"category_name_seo":"telecomnews"}],"related_content":[],"msid":62349450,"entity_type":"ARTICLE","title":"Narendra Modi's Gujarat RoW policy 4G biased: Telecom group","synopsis":"Based on a proposal of Reliance Industries\u2019 Infotel Broadband Service Limited (IBSL) which procured Broadband Wireless Access spectrum in 2010, the 21-page guideline talks about deploying telecom network for \u20184G services\u2019 alone.","titleseo":"telecomnews\/gujarats-row-policy-only-favors-4g-technology-taipa","status":"ACTIVE","authors":[{"author_name":"Muntazir Abbas","author_link":"\/author\/479234376\/muntazir-abbas","author_image":"https:\/\/etimg.etb2bimg.com\/authorthumb\/479234376.cms?width=100&height=100&hostid=268","author_additional":{"thumbsize":true,"msid":479234376,"author_name":"Muntazir Abbas","author_seo_name":"muntazir-abbas","designation":"Editor","agency":false}}],"Alttitle":{"minfo":""},"artag":"ETTelecom","artdate":"2018-01-03 12:58:15","lastupd":"2018-01-03 22:04:45","breadcrumbTags":["Narendra Modi","4G","Reliance Jio","TAIPA","Telecom","Infotel Broadband Service","Towers","ATC","Tilak Raj Dua","Row","Bharti Airtel","GTL","Vodafone","policy"],"secinfo":{"seolocation":"telecomnews\/gujarats-row-policy-only-favors-4g-technology-taipa"}}" data-news_link="//www.iser-br.com/news/gujarats-row-policy-only-favors-4g-technology-taipa/62349450">