\"\"
<\/span><\/figcaption><\/figure>Vedanta Resources<\/a> Chairman Anil Agarwal on Saturday said production at its semiconductor<\/a> and display manufacturing unit in Gujarat will start within two and a half years of the groundbreaking ceremony. Semiconductor chips, used in cars, mobile phones<\/a> and other electronics devices<\/a>, are not manufactured in India at present.

Speaking at the
HT Leadership Summit<\/a>, Agarwal said \"My heart and soul is into it and the way the government is supporting, the state government is supporting... I have no doubt that within two and a half years (of the groundbreaking ceremony production will start).\"

A joint venture of the Indian conglomerate
Vedanta<\/a> and Taiwanese electronics manufacturing giant Foxconn<\/a> signed a Memorandum of Understanding with the Gujarat government earlier to set up a semiconductor and display manufacturing unit in the state.

Vedanta-Foxconn would invest Rs 1,54,000 crore to set up the facility in Gujarat, which would create one lakh job opportunities, Chief Minister Bhupendra Patel had said after the MoU was signed.

Out of the total investment of Rs 1,54,000 crore, Rs 94,000 crore will go into setting up the display manufacturing unit, while Rs 60,000 crore will be invested for the semiconductor manufacturing facility.

Agarwal said that a scientific plan has been devised for the plant.

Stating that an independent committee, comprising very good consultants, which went to five to six states to zero in on one site for the plant, found that Gujarat was the best option, as it has the right atmosphere and was also providing better facilities for the unit.

\"We are setting (the plant) there (in Gujarat),\" he explained.

\"We had gone to Maharashtra... In Maharashtra downstream will be set up which will be bigger than Gujarat,\" Agarwal explained.<\/body>","next_sibling":[{"msid":95472166,"title":"Computer chip ban signals new era as Biden and Xi meet","entity_type":"ARTICLE","link":"\/news\/computer-chip-ban-signals-new-era-as-biden-and-xi-meet\/95472166","category_name":null,"category_name_seo":"telecomnews"}],"related_content":[{"msid":"95472870","title":"Production at Vedanta-Foxconn semiconductor plant to start within two and half yrs of groundbreaking: Anil Agarwal","entity_type":"IMAGES","seopath":"industry\/cons-products\/electronics\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal","category_name":"Production at Vedanta-Foxconn semiconductor plant to start within two and half yrs of groundbreaking: Anil Agarwal","synopsis":false,"thumb":"https:\/\/etimg.etb2bimg.com\/thumb\/img-size-5166\/95472870.cms?width=150&height=112","link":"\/image\/industry\/cons-products\/electronics\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal\/95472870"}],"msid":95473972,"entity_type":"ARTICLE","title":"Production at Vedanta-Foxconn semiconductor plant to start within two and half yrs of groundbreaking: Anil Agarwal","synopsis":"Speaking at the HT Leadership Summit, Agarwal said \"My heart and soul is into it and the way the government is supporting, the state government is supporting... I have no doubt that within two and a half years (of the groundbreaking ceremony production will start).\"","titleseo":"telecomnews\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal","status":"ACTIVE","authors":[],"analytics":{"comments":0,"views":233,"shares":0,"engagementtimems":1124000},"Alttitle":{"minfo":""},"artag":"PTI","artdate":"2022-11-12 17:27:09","lastupd":"2022-11-12 17:36:58","breadcrumbTags":["vedanta","vedanta resources","ht leadership summit","vedanta","devices","foxconn","semiconductor","mobile phones","chip","electronic devices"],"secinfo":{"seolocation":"telecomnews\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal"}}" data-authors="[" "]" data-category-name="" data-category_id="" data-date="2022-11-12" data-index="article_1">

生产Vedanta-Foxconn半导体工厂开始的两年半内开创性:Anil Agarwal

在HT领导峰会上发表讲话时,阿加沃说:“我的心和灵魂和政府的支持,政府支持……我毫不怀疑,在两年半(破土动工仪式的生产将开始)。”

  • 2022年11月12日更新是05:36点
阅读: 100年行业专业人士
读者的形象读到100年行业专业人士

韦丹塔资源主席星期六Anil Agarwal说的生产半导体在古吉拉特邦和显示制造部门将开始在两年半的开创性的仪式。半导体芯片,用于汽车,移动电话和其他电子产品设备目前,印度不生产。

HT领导峰会,阿加沃说:“我的心和灵魂和政府的支持,政府支持……我毫不怀疑,在两年半(破土动工仪式的生产将开始)。”

印度企业集团的合资企业吠檀多和台湾电子制造业巨头富士康早些时候签署了一份谅解备忘录与古吉拉特邦政府建立一个半导体制造单元和显示。

广告
Vedanta-Foxconn将投资Rs 54000卢比在古吉拉特邦设置设施,这将创建一个十万的工作机会,首席部长Bhupendra Patel说了后签署了谅解备忘录。

总投资的Rs 54000卢比,94000卢比将进入设置显示制造子公司,而将投资60000卢比的半导体制造设备。

阿格沃尔说,植物科学计划被设计了。

说明一个独立委员会,由很好的顾问,去五到六个州零植物在一个站点,发现古吉拉特邦是最好的选择,因为它有权利气氛,也为单位提供更好的设备。

“我们正在设置(植物)(在古吉拉特邦),”他解释道。

“我们去了马哈拉施特拉邦……将设立在马哈拉施特拉邦下游将大于古吉拉特邦,”阿加瓦尔解释说。
  • 发布于2022年11月12日下午05:27坚持
是第一个发表评论。
现在评论

加入2 m +行业专业人士的社区

订阅我们的通讯最新见解与分析。乐动扑克

下载ETTelec乐动娱乐招聘om应用

  • 得到实时更新
  • 保存您最喜爱的文章
扫描下载应用程序

\"\"
<\/span><\/figcaption><\/figure>Vedanta Resources<\/a> Chairman Anil Agarwal on Saturday said production at its semiconductor<\/a> and display manufacturing unit in Gujarat will start within two and a half years of the groundbreaking ceremony. Semiconductor chips, used in cars, mobile phones<\/a> and other electronics devices<\/a>, are not manufactured in India at present.

Speaking at the
HT Leadership Summit<\/a>, Agarwal said \"My heart and soul is into it and the way the government is supporting, the state government is supporting... I have no doubt that within two and a half years (of the groundbreaking ceremony production will start).\"

A joint venture of the Indian conglomerate
Vedanta<\/a> and Taiwanese electronics manufacturing giant Foxconn<\/a> signed a Memorandum of Understanding with the Gujarat government earlier to set up a semiconductor and display manufacturing unit in the state.

Vedanta-Foxconn would invest Rs 1,54,000 crore to set up the facility in Gujarat, which would create one lakh job opportunities, Chief Minister Bhupendra Patel had said after the MoU was signed.

Out of the total investment of Rs 1,54,000 crore, Rs 94,000 crore will go into setting up the display manufacturing unit, while Rs 60,000 crore will be invested for the semiconductor manufacturing facility.

Agarwal said that a scientific plan has been devised for the plant.

Stating that an independent committee, comprising very good consultants, which went to five to six states to zero in on one site for the plant, found that Gujarat was the best option, as it has the right atmosphere and was also providing better facilities for the unit.

\"We are setting (the plant) there (in Gujarat),\" he explained.

\"We had gone to Maharashtra... In Maharashtra downstream will be set up which will be bigger than Gujarat,\" Agarwal explained.<\/body>","next_sibling":[{"msid":95472166,"title":"Computer chip ban signals new era as Biden and Xi meet","entity_type":"ARTICLE","link":"\/news\/computer-chip-ban-signals-new-era-as-biden-and-xi-meet\/95472166","category_name":null,"category_name_seo":"telecomnews"}],"related_content":[{"msid":"95472870","title":"Production at Vedanta-Foxconn semiconductor plant to start within two and half yrs of groundbreaking: Anil Agarwal","entity_type":"IMAGES","seopath":"industry\/cons-products\/electronics\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal","category_name":"Production at Vedanta-Foxconn semiconductor plant to start within two and half yrs of groundbreaking: Anil Agarwal","synopsis":false,"thumb":"https:\/\/etimg.etb2bimg.com\/thumb\/img-size-5166\/95472870.cms?width=150&height=112","link":"\/image\/industry\/cons-products\/electronics\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal\/95472870"}],"msid":95473972,"entity_type":"ARTICLE","title":"Production at Vedanta-Foxconn semiconductor plant to start within two and half yrs of groundbreaking: Anil Agarwal","synopsis":"Speaking at the HT Leadership Summit, Agarwal said \"My heart and soul is into it and the way the government is supporting, the state government is supporting... I have no doubt that within two and a half years (of the groundbreaking ceremony production will start).\"","titleseo":"telecomnews\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal","status":"ACTIVE","authors":[],"analytics":{"comments":0,"views":233,"shares":0,"engagementtimems":1124000},"Alttitle":{"minfo":""},"artag":"PTI","artdate":"2022-11-12 17:27:09","lastupd":"2022-11-12 17:36:58","breadcrumbTags":["vedanta","vedanta resources","ht leadership summit","vedanta","devices","foxconn","semiconductor","mobile phones","chip","electronic devices"],"secinfo":{"seolocation":"telecomnews\/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal"}}" data-news_link="//www.iser-br.com/news/production-at-vedanta-foxconn-semiconductor-plant-to-start-within-two-and-half-yrs-of-groundbreaking-anil-agarwal/95473972">